launchdarkly-guarded-rollout

Cấu hình triển khai có kiểm soát với tăng lưu lượng dần dần, giám sát chỉ số và tự động quay lui. Sử dụng khi phát hành tính năng dần dần với an toàn…

npx skills add https://github.com/launchdarkly/ai-tooling --skill launchdarkly-guarded-rollout

LaunchDarkly Guarded Rollouts

You're using a skill that will guide you through configuring guarded rollouts in LaunchDarkly. Your job is to design rollout stages, select monitoring metrics, configure regression thresholds, and start the rollout.

Prerequisites

This skill requires the remotely hosted LaunchDarkly MCP server to be configured in your environment.

Required MCP tools:

  • start-guarded-rollout -- start a progressive rollout with monitoring
  • get-flag -- inspect the flag and its variations
  • list-metrics -- find metrics to monitor during the rollout

Optional MCP tools:

  • stop-guarded-rollout -- halt an active rollout immediately
  • toggle-flag -- ensure the flag is turned on before starting
  • create-metric -- create metrics if they don't exist

Core Concepts

What Are Guarded Rollouts?

A guarded rollout progressively increases traffic to a new feature flag variation through a series of stages. At each stage, LaunchDarkly monitors selected metrics for regressions. If a regression is detected, the rollout can automatically pause and notify the team — or even roll back.

Key Components

ComponentDescription
Test variationThe new variation being rolled out
Control variationThe existing/baseline variation
StagesSteps with increasing traffic percentage and monitoring windows
MetricsWhat to monitor for regressions (error rate, latency, etc.)
Regression thresholdHow much a metric can degrade before triggering action
On regressionWhether to notify, rollback, or both when a threshold is breached

Rollout Weight Units

Rollout weights use thousandths (basis points):

  • 1000 = 1%
  • 10000 = 10%
  • 50000 = 50%
  • 100000 = 100%

Monitoring Window

The monitoring window is specified in milliseconds:

  • 3600000 = 1 hour
  • 86400000 = 24 hours
  • 604800000 = 7 days

Core Principles

  1. Start Small: Begin with a low percentage (1-5%) to catch issues early
  2. Monitor What Matters: Choose metrics that reflect user experience
  3. Set Realistic Thresholds: Too tight = false alarms; too loose = missed regressions
  4. Allow Time: Each stage needs enough monitoring time for signal to emerge
  5. Have a Rollback Plan: Always configure at least notification on regression

Workflow

Step 1: Prepare

Before starting a guarded rollout:

  1. Use get-flag to inspect the flag — note the variation IDs for test and control
  2. Use list-metrics to find metrics suitable for monitoring
  3. Ensure the flag is on in the target environment (use toggle-flag if needed)
  4. Confirm there's no active guarded rollout on this flag already

Step 2: Design Stages

Plan the rollout progression. A typical pattern:

StageTrafficMonitoring WindowPurpose
11%1 hourSmoke test — catch obvious crashes
210%24 hoursEarly signal on metrics
350%24 hoursConfidence building
4100%24 hoursFull rollout with monitoring

Step 3: Configure Metrics

Select metrics that indicate problems:

Metric TypeExampleThresholdAction
Error rateapi-error-rate0.05 (5% increase)Rollback
Latencyp99-response-time0.2 (20% increase)Notify
Conversioncheckout-completed0.1 (10% decrease)Notify + Rollback

Step 4: Start the Rollout

Use start-guarded-rollout:

{
  "projectKey": "my-project",
  "flagKey": "new-checkout-flow",
  "environmentKey": "production",
  "testVariationId": "variation-id-for-new-flow",
  "controlVariationId": "variation-id-for-current-flow",
  "randomizationUnit": "user",
  "stages": [
    {"rolloutWeight": 1000, "monitoringWindowMilliseconds": 3600000},
    {"rolloutWeight": 10000, "monitoringWindowMilliseconds": 86400000},
    {"rolloutWeight": 50000, "monitoringWindowMilliseconds": 86400000},
    {"rolloutWeight": 100000, "monitoringWindowMilliseconds": 86400000}
  ],
  "metrics": [
    {
      "metricKey": "api-error-rate",
      "onRegression": {"notify": true, "rollback": true},
      "regressionThreshold": 0.05
    },
    {
      "metricKey": "checkout-completed",
      "onRegression": {"notify": true, "rollback": false},
      "regressionThreshold": 0.1
    }
  ]
}

Step 5: Verify

  1. Use get-flag to confirm the guarded rollout is active
  2. Check that the flag shows the rollout configuration in the environment
  3. Monitor for any immediate regression notifications

Report results:

  • Guarded rollout started with N stages
  • M metrics being monitored
  • First stage at X% traffic for Y hours

Stopping a Rollout

If issues arise or you need to halt the rollout:

{
  "projectKey": "my-project",
  "flagKey": "new-checkout-flow",
  "environmentKey": "production"
}

This immediately stops the progressive rollout and locks the flag at its current state.

Edge Cases

SituationAction
Flag is offTurn it on first with toggle-flag — rollouts require the flag to be on
Active rollout existsStop it first with stop-guarded-rollout before starting a new one
No suitable metricsCreate metrics first with create-metric
Approval requiredIf the environment requires approvals, the tool will return an approval URL

What NOT to Do

  • Don't start a guarded rollout on a flag that's turned off
  • Don't skip the monitoring window design — rushing through stages defeats the purpose
  • Don't set regression thresholds to 0 — small fluctuations are normal
  • Don't forget to configure at least one metric — a rollout without monitoring is just a regular rollout

Thêm skills từ launchdarkly

aiconfig-online-evals
launchdarkly
KHÔNG DÙNG NỮA chuyển hướng — kỹ năng này đã được đổi tên thành online-evals. Không sử dụng kỹ năng này; hãy gọi online-evals thay thế. Chỉ giữ lại để các tham chiếu cũ đến…
official
launchdarkly-experiment-setup
launchdarkly
Thiết lập và chạy các thử nghiệm trong LaunchDarkly. Tạo thử nghiệm với các chỉ số, phương pháp xử lý và cấu hình flag, bắt đầu các vòng lặp để thu thập dữ liệu, hoán đổi thiết kế giữa…
official
custom-metrics
launchdarkly
Tạo, theo dõi, truy xuất, cập nhật và xóa các chỉ số kinh doanh tùy chỉnh cho cấu hình. Bao gồm toàn bộ vòng đời: xác định loại chỉ số qua API, phát sự kiện qua SDK, và…
official
projects
launchdarkly
Hướng dẫn thiết lập các dự án LaunchDarkly trong codebase của bạn. Giúp bạn đánh giá stack, chọn cách tiếp cận phù hợp và tích hợp quản lý dự án mà…
official
aiconfig-ai-metrics
launchdarkly
ĐÃ LỖI THỜI chuyển hướng — kỹ năng này đã được đổi tên thành built-in-metrics. Không sử dụng kỹ năng này; hãy gọi built-in-metrics thay thế. Chỉ giữ lại để các tham chiếu cũ đến…
official
aiconfig-projects
launchdarkly
ĐÃ LỖI THỜI chuyển hướng — kỹ năng này đã được đổi tên thành projects. Không sử dụng kỹ năng này; hãy gọi projects thay thế. Chỉ giữ lại để các tham chiếu cũ đến aiconfig-projects…
official
aiconfig-migrate
launchdarkly
ĐÃ LỖI THỜI chuyển hướng — kỹ năng này đã được đổi tên thành migrate. Không sử dụng kỹ năng này; hãy gọi migrate thay thế. Chỉ giữ lại để các tham chiếu cũ đến aiconfig-migrate vẫn…
official
aiconfig-tools
launchdarkly
ĐÃ LỖI THỜI chuyển hướng — kỹ năng này đã được đổi tên thành tools. Không sử dụng kỹ năng này; hãy gọi tools thay thế. Chỉ giữ lại để các tham chiếu cũ đến aiconfig-tools vẫn hoạt động…
official