ifrCoworker
motor de informes financieros internacionales para agentes y usuarios de API REST, asientos contables, generación de estados financieros, pista de auditoría con cálculos, automatización de informes financieros
Documentación
for companies
what it can do
What you get from every calculation — not just a number.
¶
Every output is cited
⛓
Standards cascade naturally
◎
No silent defaults
⬡
XBRL-tagged from the start
⚡
AI-first via MCP
⊞
Batch period-end closing
≡
Full workings for audit trails
⊟
Consolidated trial balance
📄
Automated financial statements
◌
IAS 10 overlay on any result
☰
Disclosure notes
↻
Cash flow statement
📊
Live-linked Calculation Workbook
◈
Schema wording built for LLM agents
⬆
Document ingestion pipeline
What we commit to — and what we don't (based on a White Paper self-evaluation)
cascade map
enter at the element —the engine activates every consequential standard
One call at the economic entry point; the response carries cascadeTrace — every potential chain listed as fired or skipped, with a reason. Completeness is an auditable artifact, not a promise.
There are twelve economic events you can start from — a revenue contract, a lease, an asset, an inventory, a financial instrument, a provision, a share-based payment, an employee obligation, a business combination, an equity-method investment, a disposal group, or a direct item. You name what happened; you never name the standard. On top of these sit the reporting and overlay entries — group consolidation, earnings per share, the cash-flow statement, segments, fair-value measurement, hyperinflation, first-time adoption and separate financials — so every supported standard is reachable from a documented entry. Everything else either attaches to one of these (a grant to its asset, borrowing costs to their qualifying asset) or is a consequence the engine derives. A cascade is one declared link from a standard to another standard it may call; the engine holds 155 of them, counted from the same registry the table below is drawn from. 23 lead to foreign exchange, 16 to deferred tax and 15 to impairment — always as consequences, never as entry points. A link fires only when the facts of the call require it, and each entry's /schema lists every chain it can fire. Check it before you trust it.
| element | entry standard | inputs completed via | consequences activated |
|---|---|---|---|
lease | IFRS 16 | IAS 37 | IFRS 5 · IFRS 9 · IAS 36 · IAS 21 · IAS 12 · IAS 40 · IFRS 15 |
financial-instrument | IFRS 9 | — | IAS 19 · IAS 21 · IAS 12 · IAS 10 · IAS 28 |
provision | IAS 37 | — | IAS 36 · IAS 21 · IAS 12 · IAS 10 · IFRS 9 · general-journal |
revenue-contract | IFRS 15 | — | IAS 37 · IAS 36 · IAS 21 · IFRS 16 · IFRS 20 · IAS 2 · IAS 16 · IAS 38 · IAS 40 · IAS 10 · IAS 12 |
employee-obligation | IAS 19 | — | IAS 37 · IAS 21 · IAS 12 · IAS 10 |
share-payment | IFRS 2 | — | IAS 12 · IAS 21 |
inventory | IAS 2 | IAS 23 · IFRS 9 hedge | IAS 21 · IAS 23 · IAS 10 · IAS 40 · IFRS 9 |
general-journal | direct events | — | — cash, equity, accruals, FX settlements — direct journal entries |
asset assetClass: LAND / BUILDINGS / … | IAS 16 | IAS 23 · IAS 37 · IFRS 9 hedge | IAS 36 · IAS 2 · IAS 20 · IAS 23 · IAS 21 · IAS 12 · IAS 10 · IFRS 5 · IAS 40 · IFRS 9 |
asset assetClass: BRAND_NAMES / MASTHEADS_PUBLISHING_TITLES / … | IAS 38 | IAS 23 · IFRS 9 hedge | IAS 20 · IAS 36 · IAS 23 · IAS 21 · IAS 12 · IAS 10 · IFRS 5 · IFRS 9 |
asset assetClass: GOODWILL / INVESTMENT_IN_SUBSIDIARY / … | IAS 36 | — | IAS 21 · IAS 12 · IAS 10 |
asset assetClass: INVESTMENT_PROPERTY | IAS 40 | IAS 23 · IFRS 9 hedge · IAS 37 | IAS 36 · IAS 21 · IAS 23 · IAS 20 · IAS 12 · IAS 2 · IAS 16 · IFRS 16 · IFRS 9 |
asset assetClass: EXPLORATION_AND_EVALUATION / EXPLORATION | IFRS 6 | IAS 23 · IAS 37 · IFRS 9 hedge | IAS 36 · IFRS 15 · IAS 2 · IAS 16 · IAS 38 · IAS 21 · IFRS 9 |
asset assetClass: INVENTORY | IAS 2 | IAS 23 · IFRS 9 hedge | IAS 21 · IAS 23 · IAS 10 · IAS 40 · IFRS 9 |
asset assetClass: FINANCIAL_ASSET / TRADE_RECEIVABLE | IFRS 9 | — | IAS 19 · IAS 21 · IAS 12 · IAS 10 · IAS 28 |
asset assetClass: CONTRACT_ASSET | IFRS 15 | — | IAS 37 · IAS 36 · IAS 21 · IFRS 16 · IFRS 20 · IAS 2 · IAS 16 · IAS 38 · IAS 40 · IAS 10 · IAS 12 |
asset assetClass: BIOLOGICAL_ASSET | IAS 41 | IFRS 9 hedge · IAS 23 | IAS 21 · IAS 2 · IAS 20 · IFRS 15 · IAS 36 · IFRS 9 |
equity-method-investment investmentType: ASSOCIATE | IAS 28 | — | IAS 36 · IAS 21 · IFRS 9 · IAS 12 · IFRS 5 |
equity-method-investment investmentType: JOINT_VENTURE | IFRS 11 | — | IAS 21 · IAS 28 |
business-combination | IFRS 3 | — | IAS 19 · IFRS 5 · IFRS 16 · IFRS 20 · IFRS 13 · IFRS 9 · IAS 12 · IAS 38 · IAS 16 · IAS 37 · IAS 36 · IFRS 2 · IAS 21 |
group | IFRS 10 | — | IFRS 3 · IAS 28 · IFRS 11 · IAS 36 · IAS 21 · IFRS 9 · IAS 7 companions built in: IFRS 3 (acquisitions), IAS 28 / IFRS 11 (associates, joint ventures), IAS 36 (goodwill), IAS 12, IAS 16, IFRS 9 (investment entities, retained interests), IAS 7 (cash flows), IFRS 5 (discontinued) — always returns group financial statements; a foreign operation is not yet translated (G-1305) |
disposal-group | IFRS 5 | — | IAS 36 · IAS 21 · IAS 12 · IAS 16 · IAS 38 · IAS 40 · IAS 41 · IFRS 9 · IAS 19 · IAS 2 · IFRS 16 · IAS 37 |
eps | IAS 33 | — | — |
fair-value-measurement | IFRS 13 | — | IAS 21 |
cash-flow-statement | IAS 7 | — | — |
separate-financials | IAS 27 | — | IAS 36 · IFRS 5 · IFRS 9 · IAS 28 |
segments | IFRS 8 | — | — |
first-time-adoption | IFRS 1 | — | IAS 12 · IAS 36 |
hyperinflation | IAS 29 | — | IAS 12 · IAS 36 |
Why this is the value. Accounting events rarely live inside one standard. A machine purchase touches IAS 16, IAS 23, IAS 37, IAS 36 and IAS 12; a receivable touches IFRS 9, IAS 21 and IAS 12. The cascade guarantees the cross-standard work happens — and cascadeTrace + ignoredInputs prove it per response: which chains fired, which were considered and skipped (with the reason), and that every submitted field was used.
posting model
the engine posts the period's movements —on top of the balances you already hold
- One period, its movements only. Every call covers the period from the end of previousReportingDate to the end of reportingDate, and its journal entries are that period's movements, split by cause (depreciation, interest, payments, changes in estimate, impairment, other comprehensive income), to be posted on top of your existing balances — never a reversal and re-posting of what earlier periods recorded.
- An item that starts inside the period gets its initial recognition and then the period's movements.
- An item held from before the period whose opening follows from its own facts and dates (its cost, its dates, its schedule) has its history computed internally: the opening is derived, only the period's movements are posted, and no initial-recognition entry is made. A derivable opening is not asked for.
- An opening that cannot be derived — an accumulated impairment, a revaluation surplus, the opening defined benefit obligation and plan assets — is a required input, and a request without it is refused, naming the field. A missing opening is never read as a new contract.
- The closing carrying amount is a check: your opening plus the movements posted equals the engine's closing.
for accounting practices
replaces thejunior IFRS accountant
Your agent reads the documents — or guides the client through intake. ifrCoworker handles the standards. Your senior reviews the output.
step 1 — gather data
rolling period-end brief
document extraction
guided client intake
No raw documents stored — only extracted text reaches ifrCoworker
→
step 2 — ifrCoworker
ifr_period_end_batch ifr_generate_workpaper ifr_propose_mapping
→
step 3 — senior reviews
calculationSheetsUrl → in every response
or push directly to Google Sheets via your agent
example prompt — copy & paste into your agent
claude.ai · MidCo Manufacturing Ltd — May 2026 monthly close
Process the May 2026 month-end close for MidCo Manufacturing Ltd
Reporting date: 31 May 2026 · Previous: 30 April 2026 · Currency: EUR · 15 economic events · 9 standards
Return: journal entries (Dr/Cr, paragraph-referenced) · workings per standard · Movements Balance · Movements in SoFP · Financial Performance (SoPL) · OCI (SoOCI) · Movements in Equity · Cashflow (SoCF) · disclosure notes · Excel workbook download link (incl. editable DCF valuation model)
01 IAS 16 Factory Building HQ Budapest · cost €2,400,000 · life 40 yr · straight-line · openingCA €2,200,000 · prev 2026-04-30
02 IAS 16 CNC Milling Machine · cost €185,000 · life 8 yr · reducing balance 25% · openingCA €63,770 · prev 2026-04-30
03 IAS 38 CRM Software v4 · cost €96,000 · life 5 yr · straight-line · openingCA €32,000 · prev 2026-04-30
04 IFRS 16 Budapest Warehouse Lease (renewal) · fixed €130,000/yr · term 36 months · IBR 5.8% · commenced 2026-01-01 · openingLiability €319,700 · prev 2026-04-30
05 IFRS 9 2-yr Trade Receivable · face €450,000 · EIR 5.2% · stage 1 · openingCA €441,450 · prev 2026-04-30
▸ show remaining 10 transactions
06 IFRS 9 Corporate Bond — FVOCI debt · face €500,000 · coupon 4.5% · EIR 4.8% · matures 2028-06-30 · openingCA €497,290 · prev 2026-04-30
07 IFRS 9 Strategic Equity Stake — FVTPL · cost €280,000 · fair value at 2026-05-31 €318,500 · openingFV €312,000 · dividend received €4,200
08 IFRS 9 Equipment Term Loan — amortised cost · face €320,000 · EIR 6.8% · openingCA €295,840 · prev 2026-04-30
09 IAS 40 Győr Investment Property — fair value model · cost €890,000 · current FV €968,000 · prior FV €950,000 · prev 2026-04-30
10 IAS 19 Defined Benefit Pension · DBO €1,682,400 · plan assets €1,618,000 · discount rate 3.8% · monthly service cost €4,860 · prev 2026-04-30
11 IAS 19 Accrued Bonus H1 2026 — short-term employee benefit · obligation €23,580 · settled within 12 months
12 IFRS 15 SaaS Subscription Revenue · contract €480,000/yr · performance OVER_TIME · recognise 1/12 for May 2026
13 IFRS 15 H1 Management Reporting Service · fee €14,000 · performance POINT_IN_TIME · delivery 2026-05-31
14 IAS 2 Raw Materials Inventory — weighted average · cost €1,240,000 · NRV €1,295,000 · no write-down
15 IAS 12 Deferred Tax — cascade · tax rate 9% · compute DTA/DTL from all temporary differences above
get started
connectin 60 seconds
Add one URL to your AI app and sign in with Google — the app connects itself. No token to copy.
Sign in to check your access status or purchase a token.
rest api
enter at the economic element — no MCP required
One endpoint family covers every economic element. The engine resolves the governing standard server-side and fires the automatic companion calculations (deferred tax, FX, borrowing costs, impairment, events after the period). Same three-step contract everywhere: schema → validate → calculate.
how to call it
Sign in to get a live, ready-to-paste example with your own token. Calling an element your token isn't entitled to still works — the API just replies with the matching error instead of a result.
files
downloadable workbooks
A sample anyone can open, and — once signed in — the Excel workbooks generated by your calculations, available for 24 hours.
The workbook the ifr_period_end_batch tool returns, for an invented company's quarter from 1 April to 30 June 2026: 26 items, being 20 across 12 standards, one journal entry and five bank statement lines, with two management-defined performance measures reconciled on the “Performance Measures (MPM)” sheet. Not advice. The request it was built from (JSON).
good to know
notes on special treatments
Below are the points where IFRS/IAS leaves room for judgement or gives no explicit answer; at each, the engine works the way described, and this cannot be changed by a parameter.
Side note: if you find any point glaringly wrong, please challenge it and write to us.
- The statement of financial position is a single delta column. It presents the change in each line from the previous reporting date to the reporting date, produced by the period's own postings, with no opening, closing or comparative columns.
- Finance lessors. Where providing finance to customers is a main business activity of the entity, lease receipts — principal and interest — are presented as operating cash flows (IAS 7.14, 7.15, 7.33).
- Finance as a main business. Where providing finance to customers is the entity's main business, interest received is classified as operating on its own line, including on lending, whatever its general election (IAS 7.33, 7.15).
- Repurchase agreements accounted for as a lease. A repurchase agreement accounted for as a lease (IFRS 15.B66(a)) is measured by the seller as an operating lessor (IFRS 16.81); a finance-lease classification is not offered.
- Value added tax. Value added tax collected or paid is presented on the same cash flow line as the amount on which it was charged, never as revenue (IFRS 15.47); where that amount is spread over several lines, the tax follows it pro rata.
- Value added tax settled with the tax authority. Value added tax settled with the tax authority — the net amount paid or refunded — is presented as an other operating cash flow (IAS 7.14).
- Exploration spend on the feasibility date. Expenditure incurred on the day technical feasibility and commercial viability become demonstrable is treated as incurred after it and is not capitalised as an exploration and evaluation asset (IFRS 6.5(b)).
- Operating cycle not stated. Where the entity does not state its normal operating cycle, it is taken to be twelve months when classifying assets and liabilities as current or non-current (IAS 1.68).
- Obligations the customer can call at any time. A contract liability the customer can require the entity to perform at any time is presented as current, whatever its expected timing (IAS 1.69(d)).
- Subscribe for the complete list!
daily IFRS learning quiz
learn IFRS a little every day —2 questions, worked answers, paragraph references
The daily IFRS learning quiz gives you a fresh set of multiple-choice questions every day. Each one is a short case with real figures — a revenue contract to allocate, a lease to measure, a group to consolidate, an impairment to test — and four possible answers. Pick one and the quiz shows the correct answer, the calculation behind it, and the IFRS or IAS paragraphs it rests on, so every question teaches the rule and not only the result.
How the daily quiz works
What the questions cover
Who it is for
Sign in to start today's IFRS quiz — free with the trial, no credit card.
pricing
request-based utilization
Schema and validate calls are always free. Request consumption is charged on calculate, batch, and data export. Every calculate runs pre-validation first — if validation fails, nothing is charged. Every successful calculate response includes step-by-step workings per standard.
Free Trial
€0
40 credits · 8 days
try this one
Standard
€33
499 credits · 33 days
Full Access
let's deal
custom volume · custom validity
Cross-standard cascades (deferred tax, foreign exchange, impairment, borrowing costs and every other auto-triggered consequence — 27 child standards in all) each count as one calculate credit.
domain coverage
31 standards. 200+ transaction types,full period processing, XBRL-tags
disclosure requirement checklist included
IFRS 1
IFRS 2 ★ Full
IFRS 3 ★ Full
IFRS 5
IFRS 6 ★ Full
IFRS 8 ★ Full
IFRS 9
IFRS 10 ★ Full
IFRS 11 ★ Full
IFRS 13
IFRS 15
IFRS 16
IFRS 20 ★ Full ⚠ Early adopter
IAS 2
IAS 7
IAS 10
IAS 12
IAS 16
IAS 19
IAS 20
IAS 21
IAS 23
IAS 27
IAS 28 ★ Full
IAS 29
IAS 33 ★ Full
IAS 36
IAS 37
IAS 38
IAS 40
IAS 41 ★ Full
AI agents: · · ·